swingness

Home/swingness

About swingness

This author has not yet filled in any details.
So far swingness has created 7 blog entries.

PUBLIC HEARING NOTICE FOR ELM CREEK PARKWAY IMPROVEMENT PROJECT 21705

CITY OF CHAMPLIN, MINNESOTA NOTICE OF PUBLIC HEARING FOR STREET AND TRAIL IMPROVEMENTS OF ELM CREEK PARKWAY, IMPROVEMENT PROJECT NO. 21705   NOTICE IS HEREBY GIVEN that the Champlin City Council will meet at the Municipal Center located at 11955 Champlin Drive, on the 8th day of May, 2017, at 7:00 p.m. for a Public [...]

T. H.169 IMPROVEMENTS

CITY OF CHAMPLIN US Trunk Highway 169 Improvements Improvement Project No. 21309   The City of Champlin proposes to reconstruct Trunk Highway (TH) 169 between the Anoka/Champlin Bridge over the Mississippi River and Hayden Lake Road, including replacing bridges 6890 and 6891 over Elm Creek. Local roadways will also be improved and pedestrian and bicycle facilities will [...]

Elm Creek Flood Control Improvements & Floodplain Map Revision Status

Elm Creek Flood Control Improvements & Floodplain Map Re: Status of FEMA Flood Study / Elm Creek Floodplain The City of Champlin is in the final stages of completing the Elm Creek Dam project and Flood Control improvements. At this time, the Elm Creek Dam is essentially complete and operating. Prior to the Elm Creek [...]

Metropolitan Council Public Hearing for Sewer Improvement Project

Metropolitan Council Environmental Services proposed Sanitary Sewer Interceptor Improvements Metropolitan Council Environmental Services (MCES) operates the sanitary sewer interceptor through Champlin which conveys sewage from the Cities of Anoka, Dayton, and Champlin south east to the Pigs-Eye Waste Water Treatment Facility. The sewer interceptor (CAB Interceptor) extends through Champlin along a route that includes street [...]

S.D.L.R., DEPUE DR., & MISS. VIEW EST. IMPROVMENT PROJECT

SOUTH DIAMOND LAKE ROAD, DEPUE DRIVE, AND MISSISSIPPI VIEW ESTATES STREET AND UTILITY IMPROVEMENTS Construction 2016: Construction for 2016 has been substantially completed. The use of all roads and public utilities are available. Remaining work includes placement of the last lift of bituminous pavement and the completion of punch-list items (clean-up).  Trail improvements from the [...]